Planning charging infrastructure with battery storage
Fleet charging and fast charging create new power peaks. Storage can buffer these peaks and relieve the grid connection.
Why charging infrastructure creates peaks
When several vehicles charge simultaneously, a high electrical power arises. This is especially true for DC fast charging, depot charging with fixed time windows or sites with a growing fleet.
Storage as a buffer
A battery storage system can pre-charge energy and additionally provide it during the charging windows. This means not every charging peak has to be drawn fully from the grid. It can reduce power costs and ease the upgrade of the grid connection.
Load management is essential
Without control, a storage system can be used incorrectly. Intelligent load and charge management prioritises vehicles, limits grid draw, accounts for PV generation and keeps reserves free for critical charging windows.
Which data is needed for planning
- Number and type of vehicles
- daily driving profiles and idle times
- desired charging power per vehicle
- existing grid-connection capacity
- planned charge points and expansion stages
- PV generation and existing load profiles
Planning for growth
Fleets often grow in stages. That is why the first expansion stage should not be considered in isolation. WERAX plans charging infrastructure, storage and grid connection so that later expansions are technically and economically prepared.